Reconstruction of the water supply system

1. Project title

Reconstruction of the water supply system (reconstruction of the water supply system).

2. Project Description

a problem or need: The water supply system of the village of Tryfonivka was severely damaged as a result of hostilities. The existing network no longer provides a reliable and safe water supply, which poses risks to residents and the functioning of critical infrastructure.

A brief idea of the project: The project envisages the restoration of centralized water supply services through the reconstruction of pipelines and replacement of damaged areas.

The purpose: Provide residents with safe drinking water, increase network reliability and improve living conditions in the community.

3. Key measures

  • reconstruction of 4,157 meters of water pipes;
  • replacement of damaged areas of the network;
  • installation of new water wells / wells;
  • installation of shut-off valves (valves);
  • installation of water meters;
  • Installation of fire hydrants.

4. Expected results

that will be created or implemented: More than 4 km of water supply infrastructure with related equipment (wells, hydrants, meters) will be completely renovated and reconstructed.

What changes will communities or beneficiaries receive: Residents will have restored access to a stable, reliable and safe centralized supply of quality drinking water, the risks for local infrastructure will disappear, and general living conditions will improve.

5. Basic information

sector: Water supply / infrastructure.

Place of implementation: Trifonivka village, Velykooleksandrivska territorial community, Beryslav district, Kherson region, Ukraine.

Target communities / beneficiaries: Residents of the village of Trifonivka.

Contractor and Partners: The project is coordinated by the Ministry of Development (Ministry for Development).

6. Funding

General budget: € 246,000 (or 12.6 million hryvnias).

Source of funding (if any): not specified.

Stage / period of implementation: The implementation period is 7 months.

7. Key indicators

Number of communities: 1 (Velykooleksandrivska territorial community / Trifonivka village).

Number of beneficiaries: 451 people.

Area, objects or other indicators: The length of the reconstruction of the water supply system is 4,157 meters.